Skip to content
Solutions

Solutions

Three engineering programs for slides that already exist in your product: raise the load class, convert a side-mount drawer to undermount soft-close, or specify the finish for the environment the slide actually lives in.

Programs

Pick the program that matches the problem

Each program starts from your duty cycle, not a catalog number - and closes with evidence your team can file.

P-01

Load Upgrade Programs

Open full program

Take an existing slide to a higher load class by changing material, section or finish — documented with cycle-test records before release.

The situation

The Load Upgrade Program starts with your real duty cycle, not a catalog number. We review the drawer weight, extension, mounting orientation and daily cycles, then recalculate the section profile so the slide is rated for the load it actually carries — with margin documented, not guessed.

What changes

Where the existing section cannot reach the target class, we change what matters: load-critical elements move to cold-rolled steel, ball retention is re-specified, and mounting interfaces are adapted so your cabinet construction stays untouched.

What you receive

Every upgrade closes with evidence you can file: a cycle-test record run under rated load, an updated drawing pack, and pre-production samples your team signs off before batch production. The result is a slide that stops coming back as a warranty line — and a specification your next project can inherit.

P-02

Undermount Retrofit Programs

Open full program

Convert an existing drawer construction to undermount soft-close slides, preserving hole spacing where possible to minimise tooling change.

The situation

The Undermount Retrofit Program is built for one situation: your drawer boxes are designed around side-mount runners, and your market now expects soft-close. Rebuilding the box is expensive; swapping slides without engineering is a warranty risk. This program takes the third path — adapt the interface, keep the box.

What changes

We survey your existing mounting interface, match undermount soft-close runners to the present hole spacing where possible, and re-engineer bracket geometry where it is not. You receive a retrofit drawing before any tooling is cut, so the change is reviewed on paper first.

What you receive

Line trials run on pre-installed samples, with a soft-close function test record for each. Once approved, batch production continues under the same in-process inspection as your current program — an upgrade your customers notice and your production plan barely feels.

P-03

Corrosion & Finish Programs

Open full program

Electroplated zinc, black oxide or powder-coated finishes matched to the environment class and verified by salt-spray testing.

The situation

The Corrosion & Finish Program treats surface treatment as a specification, not a cosmetic choice. White rust on a shipped batch usually means the plating class was never matched to the real environment — coastal humidity, cleaning chemicals or outdoor condensation. We start from the environment your slides actually live in.

What changes

Based on that class we specify the coating — electroplated zinc, black oxide or powder coat — and verify it in-house: salt-spray testing to the agreed hours, cross-cut adhesion and thickness measurement, with results documented per batch for traceability.

What you receive

You receive a finish spec sheet your purchasing team can attach to the order, the salt-spray report behind it, and batch coating records with every shipment. The finish that survives its market — and the paperwork that proves it.

Evidence

How every program closes

Every program ends with documents your team can file - not a promise.

01

Cycle-test record

A test record run under rated load, documented before the upgrade is released.

02

Drawing pack first

The retrofit drawing is approved on paper before any tooling is cut.

03

Signed-off samples

Pre-production samples are function-tested and approved by your team before batch production.

04

Batch records

Coating and inspection records ship with every batch, under the same in-process inspection as your current program.

Questions

Before you start a program

Can the load class be raised without changing our cabinet?

Where the existing section cannot reach the target class, load-critical elements move to cold-rolled steel, ball retention is re-specified and mounting interfaces are adapted - so your cabinet construction stays untouched.

Can a side-mount drawer be converted to undermount soft-close?

Yes. We survey your existing mounting interface, match undermount soft-close runners to the present hole spacing where possible, and re-engineer bracket geometry where it is not. You receive a retrofit drawing before any tooling is cut.

How is the finish verified before shipment?

Salt-spray testing to the agreed hours, cross-cut adhesion and thickness measurement, with results documented per batch for traceability - plus a finish spec sheet your purchasing team can attach to the order.

Describe the problem, not the part number

Send the application, the current slide and the target requirement - engineering replies within 48 hours with the program that fits.

Chat on WhatsApp